Technical Data
Incorporating the patented EPDM jointing seals the post tensioned settlement tanks can be designed to accommodate pipe work entries through the precast wall panels.
If required Halfen slot can be cast into the internal concrete panel face during precast manufacture to allow the post fixing on site of GRP or Stainless Steel launder chanel and scum boxes.